areas-area-available-2.html
Vind_UK
3 / 4
denmark?s most central deep water
port
ship arrival ? sufficient water depth - up to 11 metres ? dedicated jack-up area for installation ships with reinforced seabed ? separate arrival facilities for crew boats on request access by road ? good infrastructure to the
port
with north and south bypass roads ? light and heavy traffic can be separat- ed in project area ? lies within isps zone with permanent fencing and video surveillance ? mobile fencing
available
for hire supply chain ? 24/7 operation possible ? no requirement for gang size ? broad selection of dedicated and skilled businesses within the
wind
industry supply chain
available
? skilled labour force
available
? grenaa and djursland can offer a wide range of hotel accommodation construction of the anholt offshore
wind
farm earned national and internatio nal recognition for the
port
of grenaa as a professio nal
wind
tur- bine
port
grenaa-port-make-4.html