day-port-com-6.html
Prices and trade terms dec. 2018
7 / 30
prices and trade terms 2018 sup
port
your business 7 2. tariffs the rates and prices listed in this folder apply to activities at, to and from gh and are valid unless otherwise agreed in writing with gh. it is the responsibility of the users of the
port
, i.e. the ship's master or agent, to supply all necessary information for calculating and collecting tariffs and, upon request by the
port
to supply ship documents, bill of loading, weight certificates etc. before a ship leaves the
port
, whether it has unloaded, loaded or simply docked at the
port
, all tariffs shall be settled or in some way guaranteed to gh. 2.1.
shipping
fees
all ships, vessels and floating structures calling at gh to turnover cargo shall pay a tariff (
shipping
fee) for docking within the breakwaters. the
shipping
fees
shall be paid by the owner or operator of the ship. commercial
port
shipping
fees
per call dkk 3.60 per gt unit minimum fee dkk 500.00 per call monthly
fees
paid in advance with unlimited calls per month dkk 20.00 per gt unit crew boats dkk 1,800.00 per week *the isps fee is included in the
shipping
fee.
fees
shall cover the ship?s stay for 7 days calculated from the date of arrival. for calls lasting more than 7 calendar days, ship?s
fees
shall be paid for every period of 7 days are part thereof. vessels requiring two tugboats during arrival can obtain a discount on the
shipping
fee. ships calling at the
port
generally pay
shipping
fees
of dkk 25.00 per sqm per month according to the max. length and breadth of the ship. ships docking at the
port
with the purpose of victualling, bunkering, replacement of crew or for reasons of comfort will be invoiced according to agreement with gh. stacking of rigs, ships, barges etc. there are special provisions for this area which require prior written agreement with gh.
dkk-day-boats-8.html