shall-port-provide-17.html
Prices and trade terms dec. 2018
18 / 30
prices and trade terms 2018 sup port your business 18 6.8. use of
crane
s with
hirer
?s
crane
signaller if the
hirer
uses his own
crane
signaller, the following applies: the
hirer
or the
hirer
?s representative
shall
make the necessary trained workers available to direct the work of the
crane
by advising the
crane
operator on the movements to be made by the
crane
. the
crane
operator is thus subject to the
hirer
?s instructions, and the work is generally carried out at the
hirer
?s own risk.
crane
s
shall
only be used for vertical lifting and
shall
not be used to free straps and chains if the cargo is sitting on top of these.
crane
s
shall
not be used to lift items, the weight of which exceeds their maximum lifting capacity. the
hirer
shall
be responsible for ensuring this. if it is necessary to move a
crane
, the
hirer
or the
hirer
?s representative
shall
ensure that the path is clear and that the
crane
's power cable is not damaged during the operation. the
hirer
shall
take out liability insurance and insurance against all risks associated with the
hirer
?s direction/use of and lifting with the
crane
. 6.9.
crane
accessories when a
crane
is hired, no additional charge is made for the grab and the hook. gh is not involved in the hooking of the cargo and does not supply the required straps and yokes unless specifically agreed. 6.10. cleaning of funnel, grab and conveyor belt the
hirer
shall
clean the funnel, grab and conveyor belt although gh may undertake to clean the machinery subject to separate agreement and against payment. the machinery
shall
be cleaned immediately after each session of use. no cargo residues or packaging, etc.
shall
be left at port areas. 6.11. right of priority in hiring out
crane
s, priority is given to the loading and unloading of ships. ships are usually loaded and unloaded in the order in which they arrive. if a ship is waiting to use a
crane
, gh is entitled to demand that the
hirer
of a
crane
speeds up the work as much as possible, and that the working hours are extended by at least 3 hours of overtime per day, at the
hirer
?s account. gh always decides to whom, for what purpose and in which order
crane
s are hired out. 6.12. liability for work with
crane
etc. the liability of gh for any injury or damage that may occur in the course of
crane
oper- ation or during transport to the site
shall
be limited to such injury or damage as may be attributed to errors made by or negligence on the part of persons employed by gh and only to the extent that the gh is found to be liable for such injury or damage pursuant to the ordinary rules of danish law. the
crane
hirer
shall
be liable for any injury or damage, regardless of whom or what may be injured or damaged, resulting from the use of chains, straps, tongs, etc. in connection with the hooking of the cargo. the
hirer
shall
also be responsible for ensuring compliance with the requirements made by the ministry of work concerning the regular examination, inspection and labelling of straps, chains, etc. the
crane
hirer
shall
also be liable for any injury or damage, regardless of whom or what may be injured or damaged, resulting from the use of the
crane
when the
hirer
uses his own
crane
signaller. gh assumes no responsibility for uninterrupted operation of
crane
s. reference is also made to the section liability and limitation of liability.
waste-charge-shall-19.html